Power shutdown in Jammu Division on 19 & 20 March: Check timings & list of areas here
JAMMU, March 18: Chief Engineer (Distribution) JPDCL, Jammu has informed that the power supply to Raghunath Bazar, Residency Road, Wazarat Road, Kanak Mandi, Rajinder Bazar and adjoining areas shall remain affected on March 19 from 9 am to 2 pm.
Similarly, the power supply to Mohinder Nagar, Bhagwati Nagar, Shakti Nagar, Canal Road, Krishna Nagar and adjoining areas shall remain affected on March 19 from 8 am to 2 pm.
Likewise, the power supply to Palli, Barwal, Sakta Chak-A, Logate Industry, PHE installations and adjoining areas shall remain affected on March 19 from 9 am to 2 pm.
Similarly, the power supply to Jhajjarkotli, Jindrah, Phalata, Salal, Katra, Reasi, SMVDU, MES, Chak, Chopra Shop and adjoining areas shall remain affected on March 19 and 20 from 5.30 am to 8 pm.
Likewise, the power supply to Industry, DC Office, Bainglad, Raiyan, Rakh, BSF, Vijaypur and adjoining areas shall remain affected on March 19 from 10 am to 3 pm.
Similarly, the power supply to Industry, Rakh, Vijaypur and adjoining areas shall remain affected on March 19 from 10 am to 3 pm.
Likewise, the power supply to Industrial Area of Bari Brahmana shall remain affected on March 19 from 9 am to 5 pm.
Similarly, the power supply to Bari Brahmana Industry shall remain affected on March 19 from 9 am to 1 pm.
Likewise, the power supply to Balli, Gulaba, Chowki Choura, Tanda Maira Mandrian, Sungal Samah and adjoining areas shall remain affected on March 19 from 9 am to 2 pm.
Similarly, the power supply to Kathua, Mahanpur, Sewa, HEP, Samba, Billawar, Ghatti, Hiranagar and adjoining areas and Railway Traction Supply Manwal shall remain affected on March 19 from 9 am to 3 pm.
Likewise, the power supply to Salehar, Old Sarore, Makhanpur, Rathana, Jinder, Mellu, Biaspur, Sai Kalan, Khanachak, Kotli, Nikowal, Kalyana, Mandal, Purmandel, Sandhi, Gurha, Utterbehni and adjoining areas shall remain affected on March 20 from 9 am to 3 pm.
Similarly, the power supply to JIO Reliance Office, Part of Greater Kailash shall remain affected on March 20 from 8 am to 3 pm.
Likewise, the power supply to Jagti Town, Nagrota, Chibba, Sanik School and adjoining areas shall remain affected on March 20 from 10 am to 5 pm.
Meanwhile, the Superintending Engineer (Distribution) JPDCL, O&M Circle Kathua has informed that the power supply to CTM Factory, GMC, Chackludan, Godrej Factory and Industries under SICOP Ist and SIDCO shall remain affected on March 19 from 9 am to 5 pm.
Similarly, the power supply to Industries under Feeder-Ist shall remain affected on March 19 from 11 am to 1 pm.
Likewise, the power supply to Industries under Feeder-3rd shall remain affected on March 19 from 10 am to 4 pm.
Similarly, the power supply to Industries under Feeder No.01, 02 and 03 shall remain affected on March 20 from 7 am to 11 am.